At KSG Civil & construction,
We recently took the opportunity to take over from Ralph Builders. Brad and his team have spent 19 years building great relationships with clients within our region and completing numerous projects. Below are examples of their excellent work:
LANSKEY
BP fuel storage facility Mackay Harbour, New concrete road, set up place and finish 2100 m2
Caltex Stage 1 Mackay Harbour. 2009- 2010 Eight Months work, footings, Bund walls 4.2m high.
Woolworths Ayr. 2012 – cold room slabs.
Shell Diesel Truck Stop Paget – 2013, structural foundations and driveways.
WDT ENGINEERS
Mackay Sugar Marian Mill facility upgrades 2005, works included removal of existing structures and construction of new facilities.
Mackay Sugar – Racecourse Mill, pump foundations
Mackay Sugar – Marian Mill, Bagasse bridge footings
Sucrogen Bioethanol – Plane creek Mill – 2 x ringbeams for new ethanol tanks
WOOLLAM CONSTRUCTIONS
Whitsunday Anglican School 2006. New Manual Arts Building
Alligator Creek School 2006, new building.
Paradise St Unit Complex
ABI GROUP
Hasting Deering Paget 2007, construction of new switch room.
JOHN HOLLAND
Mackay Water Recycling Project .2007, Place and finish 13500 m2 concrete. The largest single pour on this job was 2600 m2 and 950 m3.
HUTCHINSON BUILDERS
Sarina Woolworths and specialty shops 2007, Set up place and finish approx 60 tilt panels and approx 8000 m2 of ground slabs.
ROB T STONE
R7 R8 Transfer Tower DBCT; 2007 Two suspended decks Inc pedestals and bolts.
End Bund Lining DBCT. 2007. Ground slabs to complete bund protection
MONADELPHOUS
S8 Counter Weight DBCT.2008. Counter Weights built to drawings.
ADEPT CONTRACTORS
Invert Protection Rail Loop, Lake Lindsay Coal Mine. 2009 Thiess project
SUCROGEN/WILMAR BIO ETHANOL
Tank Farm Bund lining protection Mackay Harbour. We were the principal contractors on this project, including 2600 m2 of earthworks and concrete bund lining.
Ethanol tank ring beam and civil works, Plain Creek mill 2011. Works included construction of 6.7 m O/D ring beam and placement of hdpe lining.
Molasses Pump station and civil works, Plain Creek Mill Sarina 2011, structural footings and formed walls 1800mm high with water proofing included
Ethanol Storage Tanks – Mackay Harbour 2014
SUCROGEN/WILMAR CANE
Switch Room Extension, Plain Creek Mill, 2011.Works inc removal of existing steel floor and brackets, build new footings, block walls, steel stairs, two suspended decks and timber work inc double fire rated doors.
Boiler two switch room build, Plain Creek mill 2012. The structure consisted of structural concrete footings, formed concrete columns, suspended first floor, block walls and a concrete roof waterproofed.
Sugar Truck road contract. Plain Creek mill 2012, The mill changed from train freighting their sugar to truck and dog freight, therefore they had to construct one kilometer of concrete roads inside the mill area, Ralph concrete was awarded the contract for the civil works and concrete placement.
Boiler Console Bathroom Renovation Plane Creek Mill – 2012.
Pans Male toilet upgrade Plane Creek Mill – 2012.
Boiler console workstation Plane Creek Mill – 2014
Control Room Upgrade Plane Creek Mill – 2014
DALRYMPLE BAY COAL TERMINAL
Blast shed facility, works included 350 m2 of ground slabs and placement of grated drains.
Slew Bearing shed, works included footings with bolts, ground slabs
ISCAPE INVESTMENTS
New shop build 8 Evans Av Mackay 2013. The scope of works Inc liaising with engineers, council, certifiers, trades and suppliers to complete the 350m2 commercial development.
FULTON HOGAN INDUSTRIES
Fulton Hogan Asphalt Plant – silo raft and weighbridge, control room and wastebin, lime silo raft, electrical switchboard pit for control room, tank farm and blockwall.
PFL SPACES
bike shelter 2013
bike shelter 2014
CES
Mackay Harbour – 2013/2014, fuel import terminal Mackay – tilt panel buildings, bund linings, fibrecrete driveways.
WHF GROUP
GP SuperclinicWalkerston – 2013/2014, suspended decks, columns, concrete stairs
Reece Mackay – 2014, tilt panels
IMES paget – 2014 (current) Industrial shed build, tilt panels, suspended decks, fibrecrete slabs
Mercy College Mackay – 2014 (current)admin works
CHEMIETECH
Pioneer Energy Mackay Harbour – 2014 – retaining walls, manifold slabs, slops tank, firewater tank, ladder slab
MCNAB
St Francis Primary School – Ayr. 2010, concrete works
HMA GREENBANK
Hardstand Extension and kerbing
QAS
Collinsville 2 x Full house renovations, internal and external. (current)
CALTEX
Civil Works