At KSG Civil & construction,

We recently took the opportunity to take over from Ralph Builders. Brad and his team have spent 19 years building great relationships with clients within our region and completing numerous projects. Below are examples of their excellent work:

 
 
Key Solutions Group Onsite Overhaul.jpg

LANSKEY

  • BP fuel storage facility Mackay Harbour, New concrete road, set up place and finish 2100 m2

  • Caltex Stage 1 Mackay Harbour. 2009- 2010 Eight Months work, footings, Bund walls 4.2m high.

  • Woolworths Ayr. 2012 – cold room slabs.

  • Shell Diesel Truck Stop Paget – 2013, structural foundations and driveways.

 

WDT ENGINEERS

  • Mackay Sugar Marian Mill facility upgrades 2005, works included removal of existing structures and construction of new facilities.

  • Mackay Sugar – Racecourse Mill, pump foundations

  • Mackay Sugar – Marian Mill, Bagasse bridge footings

  • Sucrogen Bioethanol – Plane creek Mill – 2 x ringbeams for new ethanol tanks

WOOLLAM CONSTRUCTIONS

  • Whitsunday Anglican School 2006. New Manual Arts Building

  • Alligator Creek School 2006, new building.

  • Paradise St Unit Complex

ABI GROUP

  • Hasting Deering Paget 2007, construction of new switch room.

JOHN HOLLAND

  • Mackay Water Recycling Project .2007, Place and finish 13500 m2 concrete. The largest single pour on this job was 2600 m2 and 950 m3.

HUTCHINSON BUILDERS

  • Sarina Woolworths and specialty shops 2007, Set up place and finish approx 60 tilt panels and approx 8000 m2 of ground slabs.

ROB T STONE

  • R7 R8 Transfer Tower DBCT; 2007 Two suspended decks Inc pedestals and bolts.

  • End Bund Lining DBCT. 2007. Ground slabs to complete bund protection

MONADELPHOUS

  • S8 Counter Weight DBCT.2008. Counter Weights built to drawings.

ADEPT CONTRACTORS

  • Invert Protection Rail Loop, Lake Lindsay Coal Mine. 2009 Thiess project

SUCROGEN/WILMAR BIO ETHANOL

  • Tank Farm Bund lining protection Mackay Harbour. We were the principal contractors on this project, including 2600 m2 of earthworks and concrete bund lining.

  • Ethanol tank ring beam and civil works, Plain Creek mill 2011. Works included construction of 6.7 m O/D ring beam and placement of hdpe lining.

  • Molasses Pump station and civil works, Plain Creek Mill Sarina 2011, structural footings and formed walls 1800mm high with water proofing included

  • Ethanol Storage Tanks – Mackay Harbour 2014

SUCROGEN/WILMAR CANE

  • Switch Room Extension, Plain Creek Mill, 2011.Works inc removal of existing steel floor and brackets, build new footings, block walls, steel stairs, two suspended decks and timber work inc double fire rated doors.

  • Boiler two switch room build, Plain Creek mill 2012. The structure consisted of structural concrete footings, formed concrete columns, suspended first floor, block walls and a concrete roof waterproofed.

  • Sugar Truck road contract. Plain Creek mill 2012, The mill changed from train freighting their sugar to truck and dog freight, therefore they had to construct one kilometer of concrete roads inside the mill area, Ralph concrete was awarded the contract for the civil works and concrete placement.

  • Boiler Console Bathroom Renovation Plane Creek Mill – 2012.

  • Pans Male toilet upgrade Plane Creek Mill – 2012.

  • Boiler console workstation Plane Creek Mill – 2014

  • Control Room Upgrade Plane Creek Mill – 2014

DALRYMPLE BAY COAL TERMINAL

  • Blast shed facility, works included 350 m2 of ground slabs and placement of grated drains.

  • Slew Bearing shed, works included footings with bolts, ground slabs

ISCAPE INVESTMENTS

  • New shop build 8 Evans Av Mackay 2013. The scope of works Inc liaising with engineers, council, certifiers, trades and suppliers to complete the 350m2 commercial development.

FULTON HOGAN INDUSTRIES

  • Fulton Hogan Asphalt Plant – silo raft and weighbridge, control room and wastebin, lime silo raft, electrical switchboard pit for control room, tank farm and blockwall.

PFL SPACES

  • bike shelter 2013

  • bike shelter 2014

CES

  • Mackay Harbour – 2013/2014, fuel import terminal Mackay – tilt panel buildings, bund linings, fibrecrete driveways.

WHF GROUP

  • GP SuperclinicWalkerston – 2013/2014, suspended decks, columns, concrete stairs

  • Reece Mackay – 2014, tilt panels

  • IMES paget – 2014 (current) Industrial shed build, tilt panels, suspended decks, fibrecrete slabs

  • Mercy College Mackay – 2014 (current)admin works

CHEMIETECH

  • Pioneer Energy Mackay Harbour – 2014 – retaining walls, manifold slabs, slops tank, firewater tank, ladder slab

MCNAB

  • St Francis Primary School – Ayr. 2010, concrete works

HMA GREENBANK

  • Hardstand Extension and kerbing

QAS

  • Collinsville 2 x Full house renovations, internal and external. (current)

CALTEX

  • Civil Works

 
 

Find out more about our other capabilities and how we can service your industry.